Sterling

Architecture

YORK LANDING FIRST NATION NURSING 2005 - 2006
STATION AND NURSES' RESIDENCE
York Landing, MB
by Calnitsky Associates Architects Inc.

A 20,450 sq.ft. (1,900 sq.m.) Nursing station with a care centre building and a residence building.

Responsibilities: Project Coordinator. Participated in preparation of contract documents.

 

PEGUIS FIRST NATION HEALTH CENTRE 2009 - 2011
Peguis MB
by Calnitsky Associates Architects Inc.

Responsibilities: Project Coordinator throughout design stages:
Preliminary drawings, design development, working drawings, code analysis, tender set preparation &
tendering.

BARREN LANDS NURSE'S STATION 2011 - 2013
Brochet, Manitoba
by Calnitsky Associates Architects Inc.

Building addition & renovation project with building area of 790 sq.m.

Responsibilities: Project Coordinator
Preliminary design, design development & working drawings. Completed tender phase and some
contract administration services during construction.

BUNIBONIBEE NURSING STATION 2009 - 2011
Oxford House, MB
by Calnitsky Associates Architects Inc.

Responsibilities:
Project Coordinator throughout design stages: Preliminary drawings, design development,
working drawings, code analysis, tender set preparation & tendering.